TECHNICAL COLLECTION
AIRJ (Rio de Janeiro International Airport) - ODEBRECHT/1973-80
Features:
The world record in prestressed concrete paving using concrete train was broken in this work. 42,000m² of paving were executed in 30 days.
Runway 09/27 - 4,000m long, 40m wide, paved in prestressed concrete by Dywidag process, 18cm thick.
Taxiway 06 - 4,129m long, 22.5m wide, paved in prestressed concrete by Dywidag process, 18cm thick.
Taxiway 05 - 3,158m long, 22.5m wide, in prestressed concrete by Dywidag process, 18cm thick.
Recovery of Runway 14/32 - 3,300m long, using existing capping as sub-base where possible, and recovery of the sub-base in the necessary areas, 26cm capping of asphalt concrete and implementation of the overall infrastructure system and facilities to transform the runway into class 1.
Some figures:
Runway 09 / 27; Taxiway 06; Taxiway 05
Prestressed concrete paved area - 252,000m²
Prestressed concrete - 45,360m³
Asphalt concrete paving - 46,300m³
Graded gravel - 302,800m³
Runway 14 / 32
Paved area in asphalt concrete - 217,790m²
Asphalt Concrete paving - 56,620m³
The world record in prestressed concrete paving using concrete train was broken in this work. 42,000m² of paving were executed in 30 days.
Runway 09/27 - 4,000m long, 40m wide, paved in prestressed concrete by Dywidag process, 18cm thick.
Taxiway 06 - 4,129m long, 22.5m wide, paved in prestressed concrete by Dywidag process, 18cm thick.
Taxiway 05 - 3,158m long, 22.5m wide, in prestressed concrete by Dywidag process, 18cm thick.
Recovery of Runway 14/32 - 3,300m long, using existing capping as sub-base where possible, and recovery of the sub-base in the necessary areas, 26cm capping of asphalt concrete and implementation of the overall infrastructure system and facilities to transform the runway into class 1.
Some figures:
Runway 09 / 27; Taxiway 06; Taxiway 05
Prestressed concrete paved area - 252,000m²
Prestressed concrete - 45,360m³
Asphalt concrete paving - 46,300m³
Graded gravel - 302,800m³
Runway 14 / 32
Paved area in asphalt concrete - 217,790m²
Asphalt Concrete paving - 56,620m³
- 1
- 2